How it fits together

One measurement.Every module.

Most construction software is a set of tools that happen to share a login. Buildiante is built so a number entered once carries forward. Here is a single quantity — measured on a drawing — travelling all the way to a purchase order. Every step below is a real feature you can use today, not a diagram of an intention.

Where a step below says AI-assisted, a real model drafts something and a person reviews and confirms it before it changes any data — that is a hard rule in the system, not a setting. Where it says smart alerts, those are rule-based checks on your own project data — not predictions, and not a trained model.
  1. Measure the room on the drawing

    Open a PDF drawing, set the scale once, and measure the floor area directly on it. The measurement stays linked to the sheet it came from.

    • Areas, lengths, and counts measured on the actual drawing — no printing, no scale ruler.
    • Select the finished measurements and send them on; the quantity travels with its label and unit.

    AI-assisted: If the BOQ arrived as a PDF with a real table, Buildiante can read that table into draft positions instead — you review every row before it lands.

  2. It arrives as a BOQ line — you price it

    The measured quantity lands as a position in the BOQ, in the section you chose, with the rate left blank. You set the rate; the section total and the BOQ grand total recalculate as you type.

    • The quantity is carried through — you never retype a number you just measured.
    • "From history" offers the median of what you have charged for the same item before; you can take it or type your own.
    • A rule-based check can flag a rate that sits well outside your own history — labelled "not a model", with the sample size shown.

    Smart alerts: Rate anomaly flags and the "from history" suggestion are arithmetic on your own past BOQs — not a prediction, not a trained model.

  3. The priced BOQ becomes a first schedule

    "Generate from BOQ" creates one activity per priced top-level section, split by each section’s cost share and chained back-to-back from a start date you give. It adds activities; it never edits or removes ones you already have.

    • A starting programme derived from the scope you already priced, not rebuilt from scratch in a separate tool.
    • Critical path and float are computed from there; rule-based delay-risk flags point at the activities most likely to slip.
  4. Package the same lines out to bid

    Select BOQ positions into a bid package. Subcontractors get a scoped, expiring link — no account — and see the descriptions and quantities, never your rates. Compare what comes back side by side.

    • The scope is the same BOQ lines — no copying items into a new document.
    • Automatic flags on the comparison: a line one bidder didn’t price, a rate far outside the others, a total far off your estimate.

    Smart alerts: Bid anomaly flags are stated rules on the bids in front of you — missing lines, per-line outliers, deviation from your estimate. No model.

  5. Award writes back, a PO follows, the invoice checks itself

    Awarding the winning bid records a subcontract and drafts its purchase order — the same scope, not re-keyed. On the PO, ordered vs. received vs. invoiced is checked line by line.

    • The award rate writes back to the BOQ; the PO carries the awarded scope.
    • The three-way match ranks any mismatch by money at risk, with a plain likely cause — so you look at the big discrepancy first.
    • A vendor invoice PDF can be read into the invoice form for you to confirm; recording it is the same manual step as always.

    AI-assisted: Invoice extraction reads a tabular invoice PDF and suggests a PO-line match with a confidence figure — you confirm before anything is recorded.

None of the handoffs above are automatic in the “set it and forget it” sense — each one is an action you take, and anything a model touches you review first. What's connected is the data: the quantity, the rate, the scope, and the award all carry forward instead of being retyped at every stage.
Inside the product

Three of those steps, in Buildiante.

Shown with demo project data.

Step 01

Estimate with confidence

Create BOQs from PDFs and BIM measurements with AI-assisted drafting for a faster first pass.

BOQ & cost estimating
Hands marking up a construction drawing with a pencil and scale ruler
Bill of Quantities for Riverside Tower: an approved v1 with priced positions grouped into sections, a markups panel for overhead, profit, contingency and tax, and a grand total bar
Step 02

Plan and control schedules

Build Gantt schedules with dependencies and critical-path visibility.

Project scheduling
A multi-storey residential tower under construction, its concrete frame rising floor by floor
Riverside Tower schedule: activity counts by status, overall progress, and a Gantt chart of activities against a today line
Step 05

Keep the field in sync

Capture daily diaries, incidents, punch lists, and controlled approvals from the site.

Field operations
Workers passing bricks hand to hand and stacking them
Riverside Tower daily diary: one entry per day with weather, equipment, site notes, photo and entry counts, and a published or draft status
Connected workflow

Enter it once.Use it everywhere.

Start with a drawing and finish with a purchase order — without retyping the number in between.

Book a Demo
One measurement, every module — the connected construction workflow | Buildiante